Global Stock News

E-Waste Recycling Pioneer Transitions to Commercial Production in 2026

E-Waste Recycling Pioneer Transitions to Commercial Production in 2026

Highlights

  • Flash Joule Heating technology targets 5 tonnes/day throughput through multiple parallel reactors by Q2 2026
  • Binding Glencore e-scrap supply agreement secures critical feedstock for 20 tonnes/day PCB inbound capacity
  • Half-year operating loss of $24.1m includes $16.2m non-cash charges; cash position strengthened to $29.8m post-$75m placement
  • Stage 1 commercialisation targets 8,000 tonnes/year PCB processing capacity at Gator Point, Texas facility
  • Net assets increased 168% year-on-year, signalling balance sheet consolidation ahead of revenue generation phase

Metallium Limited (ASX:MTM) stands at a critical juncture in its corporate lifecycle. The Australian technology…

Source link

Share this article

Scroll to Top